____ is a possible cause of cost overruns related to human resource issues.
a. unrealistic estimates
b. poor monitoring of progress
c. inaccurate TCO forecast
d. turnover
Answer: D
Learn More :
Compiler Design
- The disadvantage of the four-model approach is ____.
- The major benefit of ____ is that it gives a clear picture of current system functions before any modifications or improvements are made.
- A decision ____ is a graphical representation of the conditions, actions, and rules found in a decision table.
- Decision trees show the logic structure in a ____.
- ___ also is called looping.
- Structured English might look familiar to programming students because it resembles ____, which is used in program design.
- The iteration structure is the completion of ____.
- Typical process description tools include ____.
- The selection structure is the completion of ____.
- In a DFD, the Gane and Sarson symbol for an entity is a ____.
- In a DFD, the Gane and Sarson symbol for a data store is a ____.
- In a DFD, the Gane and Sarson symbol for data flow is a ____.
- In a DFD, the Gane and Sarson symbol for a process is a ____.
- A ____ table shows a logical structure, with all possible combinations of conditions and resulting actions.
- A ____ description documents the details of a functional primitive, which represents a specific set of processing steps and business logic.
- In the accompanying figure, the sequence structure is the completion of ____.
- ___ is based on combinations of the three logical structures, or control structures (one of which is shown in the accompanying figure), which serve as building blocks for the process.
- In a data dictionary, some data elements have ____ rules, such as an employee's salary must be within the range defined for the employee's job classification.
- A data dictionary specifies a data element's ____, which is the set of values permitted for the data element.
- In a data dictionary, ____ is the maximum number of characters for an alphabetic or character data element or the maximum number of digits and number of decimal positions for a numeric data element.
- In a data dictionary, ____ refers to whether the data element contains numeric, alphabetic, or character values.
- In a data dictionary, any name other than the standard data element name is called a(n) ____.
- The data dictionary usually records and describes a default value, which is the ____.
- In a data dictionary, data elements are combined into ____, which are meaningful combinations of data elements that are included in data flows or retained in data stores.
- In a data dictionary, a(n) ____ is the smallest piece of data that has meaning within an information system.
If the answers is incorrect or not given, you can answer the above question in the comment box. If the answers is incorrect or not given, you can answer the above question in the comment box.